UrLayout 5.5.22
Analog IC layout and verification
Generate analog layouts from a netlist and check each revision against the design rules and schematic.
Case study
How long does an OTA layout revision take?
We ran two tasks on a six-transistor operational transconductance amplifier (OTA) using the SKY130 process.
- Regenerate after a device resize
- 1 min 48 s
One candidate passed both design rule checking (DRC) and layout versus schematic (LVS).
- Initial area search
- ≈ 43 min
Of 32 candidates, 16 passed both checks. The best reduced area by 68%, from about 5,200 to 1,650 µm².
Measured on one workstation with an AMD Ryzen 9 PRO, 128 GB of RAM and an NVIDIA RTX PRO 2000 (16 GB).
Review the case studyTechnical workflows
XLSX
Draw metal and insert vias
Use worksheet coordinates and line widths to draw paths on metal layers.

SKY130 / GF180MCU
Generate an OTA layout
Compare layouts for a six-transistor amplifier on two open PDKs.

CDL
Place SRAM control logic
Compare transistor placements under row and pin constraints.
- Layout formats
- GDS / OASIS
- Netlist input
- CDL
- Demo PDKs
- SKY130 / GF180MCU